Galex Systems Inc.

14 – Canadian Steamship Line

CANADIAN STEAMSHIP LINE

Vessel: M/V LAURENTIAN

Self-unloading bulk carrier

Systems:

New PLC based Shut-Down system for the propulsion engines was installed. The Service MCC and unloading MCC were upgraded with new circuit breakers and controls.

Equipment supplied/refurbished:

  • Service and unloading MCC’s,
  • Shut-Down System.

Engineering services provided:

      • Mechanical and Electrical Engineering and drafting for the Service and unloading MCC’s and Shut-Down System.

Project Management:

      • Turnkey project for Service and unloading MCC’s and Shut-Down System.

Installation, Manufacturing and Commissioning:

    Shut-Down System and updating of the Service Motor Control Centers.

Technical documentation:

Shut-Down System,– Complet documentation Package

2002, St-Catherine, Ont.