Project Description
CANADIAN STEAMSHIP LINE
Vessel: M/V LAURENTIAN
Self-unloading bulk carrier
Systems:
New PLC based Shut-Down system for the propulsion engines was installed. The Service MCC and unloading MCC were upgraded with new circuit breakers and controls.
Equipment supplied/refurbished:
- Service and unloading MCC’s,
- Shut-Down System.
Engineering services provided:
- Mechanical and Electrical Engineering and drafting for the Service and unloading MCC’s and Shut-Down System.
Project Management:
- Turnkey project for Service and unloading MCC’s and Shut-Down System.
Installation, Manufacturing and Commissioning:
- Shut-Down System and updating of the Service Motor Control Centers.
Technical documentation:
Shut-Down System,– Complet documentation Package
2002, St-Catherine, Ont.